Southeastern Pennsylvania Transportation Authority (SEPTA)

Philadelphia, PA

Overview

Project Status: Active

Timeline: 2016 – present

Services Provided:

  • Safety and Security Certification
  • SMS
  • FTA Safety Management Inspection support
  • Fatigue Risk Management Program
  • Training
  • Emergency Management
  • Risk Based Assessment
  • Technical Writing
  • Roadway Worker Protection
  • Safety Staffing Assessment
  • Safety Audits
  • Training Program Assessment

Projects Completed

Provide various SMS, Training, Emergency Management, and Safety and Security Certification support services.

  • Various Standard Operating Procedures (SOPs) development
  • Various program plans; SSMP, SSCP, FRA compliant – SSP – Part 270
  • “Internal Safety Audits” of several System Safety Program Plans (SSPP)
  • Hazard Identification, Assessment, and Mitigation Training Program
  • Roadway Worker Protection Program and Training Program update
  • Emergency Management Operations Plan (EMOP) development
  • City Hall Station Renovation Project Certification support (design)
  • NIMS and ICS training for SEPTA staff
  • SEPTA’s Railroad System Safety Program Plan (SSPP) development
  • SEPTA PTASP with follow up updates
  • NIMS/ICS and Emergency Management Operations Plan (EMOP) training
  • Assessment of the SEPTA Safety Division and Report
  • Grade Crossing Inventory Study and Report
  • King of Prussia project Safety and Security Certification oversight activities
  • Risk-Based Inspection Implementation Program
  • Trolley Modernization Safety and Security Certification
  • Trolley Modernization Threat and Vulnerability Assessment
  • Fatigue Risk Management Program
  • FRA required System Safety Program Plan development
  • SSPP Annual Assessment
  • FRMP Annual Assessment
  • Support management and response to the FTA Safety Management Inspection
  • Draft Corrective Action Plans
  • Support responses to the PennDOT SSOA
  • Draft monthly regulatory brief newsletter
  • Conduct PTASP Internal Safety Audits – Develop training programs
  • Draft System Safety staff job descriptions
  • Develop and draft various safety program procedures
  • Develop Internal Safety Audit Program and Procedures

 

FTA Safety Management Inspection.

  • Initial responses to FTA
  • Managed working groups
  • Developed response templates
  • Developed initial responses and action plans
  • Developed reports, studies, training programs, SOPs, and other deliverables specifically responsive to FTA required actions
  • Developed programs, procedures, training, research reports, and other deliverables to fulfill FTA-required actions.

 

Corrective Action Planning and Hazard Analysis Support

  • Managing Corrective Action Planning and Hazard Inquiries
  • Developing tools for CAP tracking and management of SSOA hazard inquiries
  • Facilitating meetings, working groups, and other organizational processes for CAP and hazard inquiry management
  • Developing Corrective Action Plans
  • Monitoring CAP implementation
  • Developing Safety Risk Assessments
  • Developing procedures, programs, training, and other deliverables in support of Corrective Action Plans

 

Provide risk based assessment services of SEPTA’s Signal System Safety and Train Control capabilities.

  • Risk Based Assessment
  • Data analysis
  • Safety Management System
  • Assessed SEPTA’s Signal System Safety and Train Control capabilities in the context of the four key hazards and nine potential consequences identified in Table 1 of FTA Safety Advisory 22-2

 

Provide Executive Level Corporate technical writing services to SEPTA management by means of seminars.

  • Technical Writing Guidance
  • Technical Training Seminars
  • Safety Management Systems

 

Provide critical safety assessment services, which focused on SEPTA’s Roadway Worker Program (RWP).

  • Roadway Worker Program (RWP) Safety Assessment
  • Risk Based Assessment
  • Data analysis
  • Safety Management System

 

Provide safety critical risk based assessment services focused on producing a Inter-car Door Hazard Analysis and Safety Risk Evaluation report.

  • Risk Based Assessment
  • Data analysis
  • Safety Management System
  • Inter-car Door Hazard Analysis and Safety Risk Evaluation Report

 

K&J has been working with SEPTA under a Safety On-Call contract since 2015. Some of those tasks include:

  • SSPP Gap Review
  • Drafted SSP Plan
  • SMS Gap Review and drafted PTASP
  • Training Program Assessment
  • Internal Safety Audits
  • Safety Division Staffing Assessment
  • Job Safety Analyses
  • Accident/Incident Investigation
  • Commuter Rail Risk Based Hazard Analysis
  • Major Project Safety and Security Certification
  • FTA Fatigue Risk Management Program
  • Drafting of Safety Plans and Procedures as requested
  • Accident/Incident Investigation Program Update
  • Emergency Management Operations Plan Update
  • SSPP Update
  • Commuter Rail Risk Based Hazard
  • Tabletop Exercise Series and Workshop
  • Assisting SEPTA with FTA Safety Management Inspection Response
  • Participated in Working Group meetings
  • Meetings with Leadership
  • Draft SOPs
  • Conduct Assessments
  • Draft reports
  • Develop and conduct Resonable Suspicion
  • Drug and Alcohol Training (Reasonable Suspicion and Post-Accident Testing Determination)
  • Trolley Modernization Program
  • Safety and Security Certification