2023 Planned Projects
Safety Certification Activities:
- Station Platform Rehabilitation and Modernization Contract 5
- Structural Rehabilitation, Package B
- Tunnel CCTV Upgrades
- OCC Process Improvements and Exercises
- Bladensburg Bus Division Design-Build Services
- Northern Bus Division Design-Build Services
- Traction Power State of Good Repair Contract #1
- Blue Line Power Upgrade System Upgrades
- Traction Power System Upgrades (Red/Green/Orange Lines)
- Yellow Line Tunnel and Bridge Rehabilitation
- Escalator Canopies Phase 3
- Potomac Yard Station
- Bladensburg Bus Division Design-Build Services
- Rail Heavy Repair and Overhaul Facility (HROF)
- Purple Line
- Safety and Security Certification Training for employees and contractors
- 6K SMP (Overhaul)
- 8K RFP / Bid Proposal review
- Escalator Canopies (Phase 4)
- Swing Crane / MOW Vehicles
- Radio Infrastructure Replacement (700 MHz)
- Blue Line Power Upgrade System Upgrades
- Traction Power System Upgrades (Red/Green/Orange Lines)
- ROCC Power Desk Program Certification
- Tagging Relay Pilot Program
- Medical Center / MD 355 Underpass Project
- Station Platform Rehabilitation, Contract 3
- Station Platform Rehabilitation, Contract 4
- Rehabilitation / Design of Three Pedestrian Bridges
- Rehabilitation / Design of Eight Segmental Bridges
- Minnesota Ave Pier Cap Replacement
- Swing Crane/MOW Vehicles Certification
- Train Wash Motion Detection Project – 6 rail yards
- Low Deck Flat Cars – 2 units
- Tie Plate inserters – 2 units
- Medical Center / MD355 Underpass
- Drain Clean/MOW Vehicle
- Station Entrance Modernization Contracts
- L’Enfant Station
- Ballston Station
- Metro Center
- Bethesda Metro South Mezzanine
- ATC Lab
- Power Operations Center Certification
- Continue the certification of the POC
- Phase 2 Silver Line project
- Oversee, assess, and document safety oversight and verification of MWAA’s Package K close out contract
- I-66 Widening Certification Project
- Elevator Project Replacement
- System-Wide Fare Gate Program
- Replacement of Drainage Pumping Stations
- RTU Replacement
- ATC Training Lab
- FLS / Safety Design Criteria Manual Development
- Virginia Square / GMU Station Elevators
- Crystal City 2nd Mezzanine Addition
- CTF Communication Room Modification Design
- Station Entrance Modernization Contracts
- L’Enfant Station
- Ballston Station
- Metro Center
- Solar Energy Systems
- ADA / Egress Compliance Projects
- Shepherd Parkway Battery Electric Bus Pilot Project Certification
- Yellow Line Tunnel and Bridge Rehabilitation
- Union Station
- Ballston Station Entrance Addition
- Smithsonian Entrance Addition
- Roslyn Station Entrance Addition
- Bus Shelter Solar Panels
- Tunnel Ventilation Pilot Program
- AC Switchgear Room Rehabilitation at 9 Stations
- Replace AC Switchgear Room Rehabilitation located at the Crystal City (C09) and Ronald Reagan Washington National Airport (C10) Stations
- Operations (SAFE Support, Administrative Support, Document Development, Training Classes)
2022 Projects
Safety certification activities:
- Quarterly Safety and Security Certification Training for employees and contractors
- 8 Car Precision Station Stopping (PSS)
Auto Doors - Stop and Proceed / Positive Train Stop
- 6K SMP (Overhaul)
- 8K RFP / Bid Proposal review
- Escalator Canopies and Stairs (Phase 4) – 11 stations
- Swing Crane / MOW Vehicles
- Radio Infrastructure Replacement (700 MHz)
- Blue Line Power Upgrade System Upgrades
- Traction Power System Upgrades (Red/Green/Orange Lines)
- Power Operations Center Certification:
- A Category 1 Safety Certification for the Power Operations Center (POC), Project based on the WMSC-22-C0212
- For the power operations center, due to the non-compliance to the established switching order procedures, fluctuating staffing levels, and training concerns, identified improvements to the governing software to improve the overall safety of the switching order(s)
- Certification activities included: overall certification of the Power Operations Center, formulation of program training requirements, lifting of the current WMSC operational restrictions, expansion of the POC to a 4th desk, and verification of the proposed software to improve the overall safety of the switching process.
- ROCC Power Desk Program Certification
- Tagging Relay Pilot Program
- Medical Center / MD 355 Underpass Project
- Station Platform Rehabilitation, Contract 1
- Station Platform Rehabilitation, Contract 2
- Station Platform Rehabilitation, Contract 3
- Station Platform Rehabilitation, Contract 4
- Rehabilitation / Design of Three Pedestrian Bridges
- Rehabilitation / Design of Eight Segmental Bridges
- Minnesota Ave Pier Cap Replacement
- Silver Line Phase 1 Project:
- Oversee, assess, and document safety oversight, and verification of MWAA’s D/B certification program, and certification of WMATA’s deliverables.
- Phase II Silver Line Project – Primary duties for WMATA SAFE include reviewing the contractor’s design and construction changes via Notice of Design Changes and Field Design Changes from an overall system criticality, safety, long-term inspection, and maintenance perspective. This work effort has led to identifying issues and suggesting potential project revisions to eliminate, lessen or mitigate the undesirable safety condition(s) identified. Additional responsibilities in the safety and security certification process for both Package A & B include project documentation reviews and updates; SSMP, SSCP, the project required Safety Certification Procedures, Certifiable Items List (CIL), one hundred percent verification of the Design Conformance Checklist, the Construction Specification Conformance (CSC), and the Systems Integration and Testing Conformance Checklists (SITC) via inspection of contract documentation to verify compliance with project specifications and criteria. Continued identification and review of Hazards and Vulnerabilities during the construction and testing process to ensure acceptable project resolution and incorporate any required additional mitigations. Verification of items within the Operational Readiness phase of the project to include: the Operational Readiness Conformance Checklist (ORCC) and the Operational Hazard Analysis (OHA). The ORCC and OHA checklists help to ensure WMATA is prepared to enter into Revenue Service. Staff developed the interim Phase 2 Verification Certification reports (SSCVR) for the WMSC/FTA/PMOC for review and comment and ultimately provide concurrence for WMATA to enter Revenue Service.
- WMATA Deliverables:
- AIT
- Fare Gate Replacement/upgrade
- Signage Updating
- N06/N07 Tie-in
- Portable Rail Car Lifts for the CTEM Shop – This will be a Safety Acceptance certification effort.
- Potomac Yard Station
- Bladensburg Bus Division Design-Build Services
- Northern Bus Division Design-Build Services
- Rail Heavy Repair and Overhaul Facility (HROF)
- ATC Upgrade Alexandria Yard
- Purple Line
- I-66 Widening Certification Project
- Elevator Project Replacement
- System-Wide Fare Gate Program
- Replacement of Drainage Pumping Stations
- RTU Replacement
- ATC Training Lab
- Safety Certification Training
- FLS / Safety Design Criteria Manual Development
- Virginia Square / GMU Station Elevators
- Crystal City 2nd Mezzanine Addition
- CTF Communication Room Modification Design
- Station Entrance Modernization Contracts
- L’Enfant Station
- Ballston Station
- Metro Center
- Solar Energy Systems
- ADA / Egress Compliance Projects
- Shepherd Parkway Battery Electric Bus Pilot Project Certification
- Yellow Line Tunnel and Bridge Rehabilitation
- Union Station Entrance Reconstruction
- Union Station
- Train Wash Facility Rehabilitation – 7 Stations
- Ballston Station Entrance Addition
- Smithsonian Entrance Addition
- Roslyn Station Entrance Addition
- Bus Shelter Solar Panels
- Emergency Trip Stations (ETS) Safety Certification
- Train Control Room Safety Certification
- Tunnel Ventilation Pilot Program
- A Category 1 Safety Certification for the Power Operations Desk, Project based on the issued FTA & NTSB review and findings for the 2015 L’Enfant Plaza Station smoke incident.
- The project is responsible for design, construction, and integration of an NFPA 130 compliant ventilation system retrofitting the existing shafts.
- AC Switchgear Room Rehabilitation at 9 Stations
- Replace AC Switchgear Room Rehabilitation located at the
- Crystal City (C09) and Ronald Reagan Washington National
- Airport (C10) Stations
- Yellow Line Tunnel and Bridge Rehabilitation
- S&I Shop Railcar Rooftop Access Platforms
- Bethesda Metro South Mezzanine – Updating Bridging Documents
- Traction Power State of Good Repair Contract #1
- Escalator Replacement and Rehabilitation projects
- Train Wash Motion Detection-6 rail yards
- 6K Coupler Overhaul
- E Clip / MOW vehicles- 4 units- project completed
- Tie Plate Inserter / MOW Vehicles- 2 units
- Drain Cleaner / MOW Vehicles- 1 unit
- Down Under Inspection / MOW Vehicles – 2 units
- Flat Cars – 40 units
- Low Deck Flat cars- 2 units
- Prime Movers / MOW Vehicles – 12 units
- Ballast Regulators / MOW Vehicles – 2 Units
- Automatic Wayside Inspection System (AWIS)
- This project encompasses the installation of seven (7) sites throughout the Metrorail System. The AWIS is comprised of two detectors: WheelScan® (wheel detection) and TBOGI-HD (truck detection). WheelScan is a wheel profile measurement technology from KLD Labs, Inc. Completed a Preliminary Hazard Analysis (PHA), Critical Items List (CIL), and Operations Hazard Analysis (OHA). An SCVR will be developed for each AWIS site. This project supports the 7000 Series Railcar Return-to-Service Project.
- Operations (SAFE Support, Administrative Support, Document Development, Training Classes)
2021
Safety Engineering On-Call Professional Services:
- Quarterly Safety and Security Certification Training for employees and contractors
- 8 Car Precision Station Stopping (PSS)
- Auto Doors
- Stop and Proceed / Positive Train Stop
- 6K SMP (Overhaul)
- 8K RFP / Bid Proposal review
- Tunnel Vacuum Train
- Escalator Canopies (phase 4)
- Swing Crane / MOW Vehicles
- Radio Infrastructure Replacement (700 MHz)
- Protran
- Blue Line Power Upgrade System Upgrades
- Traction Power System Upgrades (Red/Green/Orange Lines)
- ROCC Power Desk Program Certification
- Developed a Category 1 Safety and Certification for the ROCC Power Desk Project based on the WMSC CAP 20-C0037
- Tagging Relay Pilot Program
- Medical Center / MD. 355 Underpass Project
- Station Platform Rehabilitation, Contract 1
- Station Platform Rehabilitation, Contract 2
- Station Platform Rehabilitation, Contract 3
- Station Platform Rehabilitation, Contract 4
- Rehabilitation / Design of Three Pedestrian Bridges
- Rehabilitation / Design of Eight Segmental Bridges
- Minnesota Ave Pier Cap Replacement
- Silver Line Project
- Oversee, assess and document safety oversight and certification:
- Dulles Phase II Project – Primary duties for WMATA SAFE include reviewing the contractor’s design and construction changes via Notice of Design Changes and Field Design Changes from an overall system criticality, safety, long-term inspection, and maintenance perspectives. This work effort has led to identifying issues and suggesting potential project revisions to eliminate, lessen or mitigate the undesirable safety condition(s). Additional responsibilities in the safety and security certification process include project documentation reviews and updates; SSMP, SSCP, the project required Safety Certification Procedures, Certifiable Items List (CIL), one hundred percent verification of the Design Conformance Checklist (for both Package A & B) and continued verification of the Construction and Startup Integration and Testing Conformance Checklists (CSC and SITC) via inspection of contract documentation to verify compliance with project specifications and criteria. Continued identification and review of Hazards and Vulnerabilities during the construction and testing process to ensure acceptable project resolution and incorporate any required additional mitigations.
- Provide necessary support, assistance, and documentation of Internal Safety Audits
- Oversee, assess and document safety oversight and certification:
- 8000 Series Rail Car Specification Safety Design Review
- Dulles Phase II Project – design, construction, and integrated testing review and verification effort
- Dulles Phase II Project – Arts-in-Transit safety acceptance verification
- Dulles Phase II Project – Automatic Fare Collection certification
- Dulles Phase II Project – Signage & Graphics certification
- Dulles Phase II Project – NO6/NO7 tie-in certification
- Radio Infrastructure Upgrade – verification support
- On-going certification efforts for Above Ground, Tunnel, and METRO Box certifiable items
- Operational Hazard Analysis (OHA) was completed for the WMATA Metrorail Phase 2 of the Dulles Corridor Silver Line project. Continue to do the verification for the OHA.
- Operational Readiness Conformance Checklist (ORCC) is completed, and verification efforts are ongoing for the Dulles Silver Line Phase 2 project.
- WMATA Deliverables
- Potomac Yard Station
- Bladensburg Bus Division Design-Build Services
- Northern Bus Division Design-Build Services
- Rail Heavy Repair and Overhaul Facility (HROF)
- ATC Upgrade Alexandria Yard
- Purple Line
- I-66 Widening Certification Project
- Elevator Project Replacement
- System Wide Fare Gate Program
- Replacement of Drainage Pumping Stations
- RTU Replacement
- ATC Training Lab
- Safety Certification Training
- FLS / Safety Design Criteria Manual Development
- Virginia Square / GMU Station Elevators
- Crystal City 2nd Mezzanine Addition
- CTF Communication Room Modification Design
- Station Entrance Modernization Contracts
- L’Enfant Station
- Ballston Station
- Metro Center
- Solar Energy Systems
- ADA / Egress Compliance Projects
- Shepherd Parkway Battery Electric Bus Pilot Project Certification
- Yellow Line Tunnel and Bridge Rehabilitation
- Union Station
- Train Wash Facility Rehabilitation – 7 Stations
- Ballston Station Entrance Addition
- Smithsonian Entrance Addition
- Roslyn Station Entrance Addition
- Bus Shelter Solar Panels
- Tunnel Ventilation Pilot Program
- AC Switchgear Room Rehabilitation at 9 Stations
- Replace AC Switchgear Room Rehabilitation located at the Crystal City (C09) and Ronald Reagan Washington National Airport (C10) Stations
- Yellow Line Tunnel and Bridge Rehabilitation
- S&I Shop Railcar Rooftop Access Platforms
- Operations (SAFE Support, Administrative Support, Document Development, Training Classes)
2020
Safety Engineering On-Call Professional Services:
- Oversee, assess and document safety oversight and certification:
- Dulles Phase II Project – Primary duties for WMATA SAFE include review of the contractor’s design and construction changes via Notice of Design Changes and Field Design Changes from an overall system criticality, safety, long term inspection and maintenance perspectives. This work effort has led to the identification of issues and suggestion of potential project revisions to eliminate, lessen or mitigate the undesirable safety condition(s). Additional responsibilities in the safety and security certification process include project documentation reviews and updates; SSMP, SSCP, project required Safety Certification Procedures, Certifiable Items List (CIL), one hundred percent verification of the Design Conformance Checklist (for both Package A & B) and continued verification of the Construction and Startup Integration and Testing Conformance Checklists (CSC and SITC) via inspection of contract documentation to verify compliance with project specifications and criteria. Continued identification and review of Hazards and Vulnerabilities during the construction and testing process to ensure acceptable project resolution to include incorporation of any required additional mitigations.
- Station Platform Rehabilitation WMATA 6 & 3 Projects – Primary duties for WMATA SAFE was limited to field verification of completed systems and post construction walkdowns.
- Station Platform Rehabilitation Phase 4 – safety certification
- Provide necessary support, assistance and documentation of Internal Safety Audits
- Oversee, assess and document safety oversight and certification:
- Completed the 7000 Series Rail Car Safety Certification
- 8000 Series Rail Car Specification Safety Design Review
- Dulles Phase II Project – design, construction and integrated testing review and verification effort
- Dulles Phase II Project – Arts-in-Transit safety acceptance verification
- Dulles Phase II Project – Automatic Fare Collection certification
- Dulles Phase II Project – Signage & Graphics certification
- Dulles Phase II Project – NO6/NO7 tie-in certification
- Radio Infrastructure Upgrade – verification support
- On-going certification efforts for Above Ground, Tunnel, and METRO Box certifiable items
- Station Platform Rehabilitation (WMATA 6) (WMATA 4) (WMATA 3) – design review, verification of the contractor’s Conformance Checklist submissions via inspection of contract documentation to verify compliance with project specifications and criteria and identification and review of Hazards and Vulnerabilities during the design and construction process to ensure acceptable project resolution to include incorporation of additional mitigations.
- Heavy repair overhaul facility – review PHAs and CILs in support of the project
- Potomac Yard Station – SSCP, SSMP, CIL and PHA completed and approved by SCRC. TVA was completed. Design verification was completed in 2020. Currently conducting Construction verification.
- Purple Line (MTA) Interfaces with WMATA — safety certification has been stopped until further notice.
- Northern Bus Garage Replacement Project – design has actually moved back to 60%. Draft PHA and CIL have been reviewed and approved by the SCWG. Waiting to submit to SCRC once IFC happens.
- Bladensburg Bus Division Project – early stages, safety certification
- Heavy Repair Overhaul & New Carrollton Yard Project – early stages, safety certification
- Bladensburg Bus Division Project – Development of Draft PHA and CIL
- Blue Line Power System Upgrades – Continued update and review of PHA and CIL items and verification documents, Approval of TUN Packages and extensions, Certificate of Conformance Packages for C12TB Bashford Lane Tie Breaker Station, and C11TB Potomac Yard Tie Breaker Station.
- Traction Power System Upgrades (Red/Green/Orange Lines) – Continued update and review of PHA and CIL items and verification documents, Approval of TUN Packages and extensions
- AC Switchgear Room Rehabilitation at 9 Stations – Approval of Draft of PHA and CIL documents and verification of supporting verification documentation.
- Replace AC Switchgear Room Rehabilitation located at the Crystal City (C09) and Ronald Reagan Washington National Airport (C10) Stations
- Yellow line Tunnel and Bridge Rehabilitation – Development of PHA, DCCC, and CIL documents and verification of supporting verification documentation.
- S & I Shop Railcar Rooftop Access Platforms – Approval of TUN Packages, PHA, and CIL documents and verification of supporting verification documentation.
- Research and drafted a comparison paper of various State Safety Oversight Agencies, regulations, program standards, codes, practices, and enforcement authority.
- Conducted Hazard Analysis and Semi-Quantitative Safety Risk Evaluation of the existing traction power restoration procedure, interim traction power restoration procedure, and “new” traction power restoration procedure, including the new Power Desk.
- Performing safety certification of the installation of the new Power Desk and modification of the Advanced Information Management (AIM) system and the General Orders and Track Rights System (GOTRS).
- Participating in a multi-year and multi-contractor project re-writing the Washington Metropolitan Area Transit Authority (WMATA) Metrorail Safety Rules and Procedures Handbook (MSRPH).
- Developed the Hazard Analysis for the return to Automatic Train Operations (ATO)for WMATA.
- Reviewed and provided comments on the WMATA draft update of its Public Transportation Agency Safety Plan.
- Performed a Safety Integrity Level (SIL) Determination Study on the “Tagging Relay” intended to enhance the safety of the traction power de-energization and energization process for the Washington Metropolitan Area Transit Authority (WMATA).
- Performing a Hazard Analysis and Semi-Quantitative Safety Risk Evaluation of the COVID-19 pandemic effects on transit systems.
- Revised and expanded the safety section of the Rail Activation Plan for the WMATA Metrorail Phase 2 of the Dulles Corridor Silver Line project.
- Completed a review of the Operational Hazard Analysis for the WMATA Metrorail Phase 2 of the Dulles Corridor Silver Line project.
- Completed a review of the SSMP for the WMATA 8000 Series rail car procurement project.
- Reviewed and provided comments on the Preliminary Hazard Analysis of the WMATA Drainage Pumping Station Rehabilitation project at 13 locations.
- Initiated development of a Pandemic Response Plan, for future pandemics.
- Reviewed the Preliminary Hazard Analysis for the WMATA Automatic Train Control Laboratory rehabilitation project.
- Developed a Preliminary Hazard Analysis for the WMATA Greenbelt Yard Pilot Automatic Wayside Inspection System (AWIS) project.
Assessment of WMATA Rail Traffic Controller Program
- K& J provided expertise in assessing the Rail Traffic Controller (RTC) training program at the Washington Metropolitan Area Transit Authority (WMATA). The training was revised to make it a highly efficient and productive training program, including a determination of the optimal training subjects, methods of delivering classroom and on-the-job (OJT) training and reduced the of overall duration of time consumed in training by six days. In addition, to delivering a revised training program, the K&J team provided forty-four recommendations to increase the overall safety and productivity within the ROCC.
Assessment of WMATA Traction Power Restoration Process
- K&J provided expertise in assessing the Rail Traffic Controller (RTC) training program at the Washington Metropolitan Area Transit Authority (WMATA). The training was revised to make it a highly efficient and productive training program, including a determination of the optimal training subjects, methods of delivering classroom and on-the-job (OJT) training and reduced the of overall duration of time consumed in training by six days. In addition, to delivering a revised training program, the K&J team provided forty-four recommendations to increase the overall safety and productivity within the ROCC.
2019
1: Safety Engineering On-Call Professional Services:
- Oversee, assess and document safety oversight and certification:
- Dulles Phase II Project – design and construction review and verification efforts. Primary duties for WMATA SAFE include review of the contractor’s design package submittals from an overall system criticality, safety, long term inspection and maintenance perspectives. This work effort has led to the identification of issues and suggestion of potential revisions to eliminate, lessen or mitigate the undesirable safety condition(s). Additional responsibilities in the safety and security certification process include project documentation reviews and updates; SSMP, SSCP, project required Safety Certification Procedures, Certifiable Items List (CIL), Design and Construction Conformance Checklists (DCC & CSC), verification of the contractor’s Conformance Checklist submissions via inspection of contract documentation to verify compliance with project specifications and criteria and identification and review of Hazards and Vulnerabilities during the design and construction process to ensure acceptable project resolution to include incorporation of additional mitigations.
- Provide necessary support, assistance and documentation of Internal Safety Audits
- Oversee, assess and document safety oversight and certification:
- 7000 Series Rail Car Safety Certification
- 8000 Series Rail Car Specification Safety Design Review
- Dulles Phase II Project – design and construction review and verification effort
- Dulles Phase II Project – Arts-in-Transit certification support
- Dulles Phase II Project – Non-Revenue Vehicles certification support
- Dulles Phase II Project – Automatic Fare Collection certification support
- Dulles Phase II Project – Signage & Graphics certification support
- Dulles Phase II Project – ROCC tie-in certification support
- Andrews Federal Center Bus Garage – certification completed October 2019
- Radio Infrastructure Upgrade – verification support
- Rehabilitation/Design of 3 Pedestrian Bridges – verification support
- Rehabilitation/Design of 8 Segmental Bridges – verification support
- Station Platform Rehabilitation & Double Crossover (WMATA 6) – design review, verification of the contractor’s Conformance Checklist submissions via inspection of contract documentation to verify compliance with project specifications and criteria and identification and review of Hazards and Vulnerabilities during the design and construction process to ensure acceptable project resolution to include incorporation of additional mitigations, 6 stations reopened in September 2019.
- Potomac Yard Station – SSCP, CIL and PHA completed and approved by SCRC. SSMP is in draft format still. TVA is being conducted by the designers ARUP. Construction trailers are set. SCWG meetings taking place monthly
- Purple Line (MTA) Interfaces with WMATA — safety certification
- Northern Bus Garage Replacement Project – early stages, safety certification
- Bladensburg Bus Division Project – early stages, safety certification
- Heavy Repair Overhaul & New Carrollton Yard Project – early stages, safety certification
- Safety and Security Certification of the accelerated six (6) Station, two (2) Drainage Pumping Station, three (3) Fan Shafts, and a Pedestrian Bridge rehabilitation project.
- Performed an assessment of the Washington Metropolitan Area Transit Authority (WMATA), Office of Track and Structures’ leak injection grouting process.
- Station Platform Rehabilitation Phase 2 – safety certification
- Station Platform Rehabilitation Phase 3 – safety certification
2018
1: Safety Engineering On-Call Professional Services:
- Oversee, assess and document safety oversight and certification:
- Dulles Phase II Project – design and construction review and verification efforts. Primary duties for WMATA SAFE include review of the contractor’s design package submittals from an overall system criticality, safety, long term inspection and maintenance perspectives. This work effort has led to the identification of issues and suggestion of potential revisions to eliminate, lessen or mitigate the undesirable safety condition(s). Additional responsibilities in the safety and security certification process include project documentation reviews and updates; SSMP, SSCP, project required Safety Certification Procedures, Certifiable Items List (CIL), Design and Construction Conformance Checklists (DCC & CSC), verification of the contractor’s Conformance Checklist submissions via inspection of contract documentation to verify compliance with project specifications and criteria and identification and review of Hazards and Vulnerabilities during the design and construction process to ensure acceptable project resolution to include incorporation of additional mitigations.
- Provide necessary support, assistance and documentation of Internal Safety Audits
- Oversee, assess and document safety oversight and certification:
- 7000 Series Rail Car Safety Certification
- 8000 Series Rail Car Specification Safety Design Review
- Dulles Phase II Project – design and construction review and verification effort
- Dulles Phase II Project – Arts-in-Transit certification support
- Dulles Phase II Project – Non-Revenue Vehicles certification support
- Dulles Phase II Project – Automatic Fare Collection certification support
- Dulles Phase II Project – Signage & Graphics certification support
- Dulles Phase II Project – ROCC tie-in certification support
- Andrews Federal Center Bus Garage – certification support
- Radio Infrastructure Upgrade – verification support
- Rehabilitation/Design of 3 Pedestrian Bridges – verification support
- Rehabilitation/Design of 8 Segmental Bridges – verification support
- Station Platform Rehabilitation & Double Crossover – verification support
- Potomac Yard Station – early stages of design review.
- Red Line Rehab Project – design review and verification report generation
- Greenbelt Test Track/Commissioning Facility – design review and verification report generation
- Purple Line (MTA) Interfaces with WMATA — safety certification
2017
1: Safety Engineering On-Call Professional Services:
- Provide necessary support, assistance and documentation of Internal Safety Audits
- Oversee, assess and document safety oversight and certification:
- 7000 Series Rail Car Safety Certification
- 8000 Series Rail Car Specification Safety Design Review
- Dulles Phase II Project – design and construction review and verification efforts.
- Dulles Phase I Project – Arts-in-Transit certification efforts.
- Andrews Federal Center Bus Garage – verification efforts.
- Radio Infrastructure Upgrade – early stages of the project to upgrade the radio infrastructure for Metro rail.
- Redline Rehab Project – verification efforts.
- Greenbelt Test Track/Commissioning Facility – verification efforts.
- Purple Line (MTA) Interfaces with WMATA — safety certification
- Facilities Fire System Assessments – (1) Metro rail station a month is having a fire assessment conducted.
- Perform various Hazard Analysis as requested; including
- N Line Emergency Ladder Landing Boards
- Vehicle Ladder deployment
- Investigate after action report findings – Ladder configuration and deployment, existing track construction configuration and training,
- West Falls Church Yard Service and Inspection Facility – Cracking found in shop floor,
- Shady Grove Turntable Assessment; Tracks 7N and 8N.
2016
1: Safety Engineering On-Call Professional Services:
- Provide necessary support, assistance and documentation of Internal Safety Audits
- Oversee, assess and document safety oversight and certification:
- 7000 Series Rail Car Safety Certification
- Dulles Phase II Project – design review and verification efforts.
- Dulles Phase I Project – Arts-in-Transit certification efforts.
- Andrews Federal Center Bus Garage – verification efforts.
- Radio Infrastructure Upgrade – early stages of the project to upgrade the radio infrastructure for Metro rail.
- Redline Rehab Project – verification efforts.
- Greenbelt Test Track/Commissioning Facility – verification efforts.
- Facilities Fire System Assessments – (1) Metro rail station a month is having a fire assessment conducted.
- Perform various Hazard Analysis as requested; including
- N Line Emergency Ladder Landing Boards
- Vehicle Ladder deployment
- Investigate after action report findings – Ladder configuration and deployment, existing track construction configuration and training,
- West Falls Church Yard Service and Inspection Facility – Cracking found in shop floor,
- Shady Grove Turntable Assessment; Tracks 7N and 8N.
2015
1: Safety Engineering On-Call Professional Services:
- Provide necessary support, assistance and documentation of Internal Safety Audits
- Oversee, assess and document safety oversight and certification:
- 7000 Series Rail Car Safety Certification
- Dulles Phase II Project – design review and verification efforts.
- Silver Spring Transit Center – verification was completed and closed on September 16, 2015
- Andrews Federal Center Bus Garage – design review completed and notice to proceed was granted
- Radio Infrastructure Upgrade – early stages of the project to upgrade the radio infrastructure for Metro rail.
- Facilities Fire System Assessments – (1) Metro rail station a month is having a fire assessment conducted.
- Perform various Hazard Analysis as requested
2014
1: Safety Engineering On-Call Professional Services:
- Provide necessary support, assistance and documentation of Internal Safety Audits
- Completed Dulles Phase I Project – Safety and Security Verification
- Oversee, assess and document safety oversight and certification:
- 7000 Series Rail Car Safety Certification
- Dulles Phase II Project – Safety and Security Verification
- Silver Spring Transit Center
- Andrews Federal Center Bus Garage
- Infrastructure Renewal Program – Safety Certification
- Documentation & Process Improvement:
- Review of all existing safety policies, procedures, instructions and protocols to ensure relevancy
- Assist in the development and timeliness of periodic external reporting requirements
- Facilities Fire system Assessments
- Assess and document current configuration management relative to SSSP
- Assess and develop standards and procedures for Safety Department
- Develop Hazard Management and Assessment guide
2013
1: Safety Engineering On-Call Professional Services:
- Provide necessary support, assistance and documentation of Internal Safety Audits
- Oversee, assess and document safety oversight and certification:
- Dulles Project – Safety and Security Certification
- 7000 Series Rail Car Safety Certification
- Infrastructure Renewal Program – Safety Certification
- Documentation & Process Improvement:
- Review of all existing safety policies, procedures, instructions and protocols to ensure relevancy
- Assist in the development and timeliness of periodic external reporting requirements
- Facilities Fire system Assessments
- Assess and document current configuration management relative to SSSP
- Assess and develop standards and procedures for Safety Department
- Develop Hazard Management and Assessment guide
2010 – 2012
1: Technical Assistance to Address Federal Transit Administration (FTA) and Tri-State Oversight Committee (TOC) Safety Recommendations:
- Conduct an assessment to identify the resources and expertise necessary for the Safety Department to carry out the activities specified in WMATA’s System Safety Program Plan, TOC’s safety oversight program standard and procedures and WMATA’s Safety Rules and Procedures Manual
- Assist WMATA to update Procedure Number 2.1/0 and Section 6 of the SSPP to develop a hazard management process in compliance with TOC’s program standard that requires that all departments participate in an on-going manner
- Assist WMATA to develop a plan to ensure that adequate technical and personnel resources are in place to perform system-wide hazard analysis as required in 49 CFR Part 659 and TOC’s Program Standard
- Assist WMATA to develop an internal process to require the communication of safety-related information across the WMATA departments, including assessments regarding the impacts of budget cuts and resource constraints on the performance of maintenance activities and requirements
- Assist WMATA to develop a process to require that proposed rules or operational changes are assessed for effectiveness prior to system-wide implementation
- Assist WMATA to determine how formal hazard analysis regarding changes made to rules and administrative procedures affecting the safety of workers on the right-of-way can be incorporated into WMATA’s rules revision process.
- Assist TOC and WMATA in developing an effective and sustainable internal safety audit program
- Assist WMATA in implementing findings and recommendations from the U.S.DOT.