HART Balanced Cantilever Construction

The Balanced Cantilevered construction time lapse video over H1-H2 merge is a segment of the 20 mile elevated structure of the Honolulu Rail Transit Project. The project is a 20 mile elevated structure that has 21 stations, dual track configuration with 20 fully automated (driver-less) 4-car trains powered by a third rail electrification power system. K & J Safety and Security Consulting Services was sub-contracted under Lawson and Associates,Inc. to provide the Honolulu Authority for Rapid Transportation (HART) with Safety and Security Certification support services. This included verification on structures, Safety and Security Design Criteria Conformance Checklist (DCCC) requirements, and Construction Specification Conformance Checklist (CSCC) requirements. The first segment of the Honolulu Rail Transit Project is scheduled to open on December 31, 2020.